1995 After
36 years of service to the Marblehead Municipal Light
Department Richard L. Bailey retires from his position
as general manager. He is succeeded by Robert V.
Jolly Jr., who was formerly the manager of technical
operations and has been with the department for 17
years.
1996 On
Monday evening, January 8, with most people at home
during the "Blizzard of 96" the Town set
a new all-time peak demand for electricity of 21,300
kilowatts. This topped the previous record of 21,175
set in 1989. Restructuring of the electric industry
moves forward as legislators and regulators meet
to determine what course to follow. Town Meeting
voters overwhelmingly adopt a bylaw requiring removal
of existing poles and overhead wires in the downtown
area.
1996-97 Work
begins on a $3 million dollar project aimed at upgrading
the entire transmission system that brings power
to Marblehead. The Lead Mill area at the border
of Marblehead and Salem received a dramatic
face-lift as two new bridges are constructed to carry
three electric conduits from Salem, and landscaping
improvements are made. In addition to enhancing system
reliability the work has also left the area safe
and attractive for hikers and bikers.

The
old railroad bridge at the Lead Mill
before improvements.

After improvements.
1998 As
a result of legislation passed last fall, many electric
consumers in Massachusetts will be able to choose
their power supplier in a competitive market beginning
March 1. As a non-profit utility, locally owned and
controlled, the Marblehead Municipal Light Department
is exempted from the March 1 start date. However,
the law requires that municipal utilities that have
not offered customer choice by March 1, 2003 conduct
studies on it's pros and cons.
After eight years of planning
and construction, the project to upgrade the Town's electric
transmission system was completed this summer. The project,
which involved replacing some 12,000 feet of older transmission
lines between Marblehead and Salem, will result in a more
reliable and efficient system capable of serving the Town's
needs for the foreseeable future.
1999 After
nearly three years of preliminary work and planning,
construction began this spring on the second phase
of a project that will place all utility services
underground in the heart of Downtown.
Work this year will focus on continuing
to build the underground duct and manhole system that must
be completed before utility equipment can be installed.
Through MMLD's Efficient Lighting Rebate
program, the Light Department contributed $10,303 towards
the cost of upgrading 2,168 existing lamps and/or fixtures
at the Marblehead High School and Middle School. Estimated
annual cost savings for the two schools total $18,353.

Installing
ductwork downtown
2000 After
much preparation in anticipation of computer related
problems at the dawning of the new millennium, the
date passed without incident in Marblehead, and most
of the world.
MMLD establishes a direct debit plan,
allowing customers to have payments for their electric
bills conveniently deducted from their checking or savings
account each month.
2001 After
two years of planning and construction, a new electrical
substation off Village Street was energized in July,
adding at least a third more capacity to the Town's
electric system.
Marblehead Light welcomed two new Light
Commissioners this spring - Alan Chipman and Wilbur E.
Bassett. Chipman, who is Commission Chairman, holds the
seat previously occupied by Michael Hercher, while Bassett
fills the position vacated by Carl Rohde. The new Commissioners
join Charles O. Phillips, Jr., who has served the board
since 1996.
MMLD institutes an Energy Efficiency
Rebate Program to encourage customers to make energy efficient
purchases of refrigerators, clothes washers, dishwashers,
electric water heaters and room and central air conditioners.
In addition, rebates are available to those wishing to
add insulation to their homes or purchase a programmable
thermostat.

The
new
Village Substation
2002 The
first residences and businesses are connected to
the new Downtown underground utility system. As each
customer is connected to the underground system,
the wires from the pole to the building will be removed,
gradually eliminating the overhead system.
2003 At
Town Meeting this year voters establish the expansion
of the Board of Light Commissioners from three to
five members. MMLD completes its share of the Downtown
underground utilities project this summer, all customers
in the designated area now receive their electricity
from an underground service. The next large construction
project, a "new" Clifton Substation (replacing
the original substation completed in 1954) is begun.

The
new Clifton
Substation
2004 In
May voters elect two new members to the Light Department
Board of Commissioners. Welcomed
to the Board are Calvin Crawford and Philip Sweeney,
for a three and two year term, respectively. In
the same election Alan Chipman is returned to his
seat on the Board for a three year term.
The new Clifton Substation is completed, improving
reliability and providing for future load growth.
Poles and overhead wires are removed downtown, completing
the project of burying utilities underground and
beautifying the Old Town area.
|